2,000
SQFT
Project overview
Capital Roof replacement with Cold Applied 2-ply modified bitumen membrane.
Highlight 01
Roof replacement completed over an operational bank, requiring careful scheduling and coordination to minimize disruption to daily operations.
Highlight 02
Roofing work required sequenced disconnect and reconnection of rooftop mechanical equipment while maintaining the project schedule and limiting building downtime.
Highlight 03
Existing roofing was removed and replaced with a new 2-ply modified bitumen system in controlled sections to maintain continuous weather protection throughout construction.


