140,000
SQFT
Project overview
Roof replacement and installation of new metal counter flashings throughout. Scope of work included interior protection over active manufacturing space, in addition to mechanical and electrical works for temperature sensitive environments.
Highlight 01
Mechanical scope of work included three refrigeration units that needed to be disconnected, roofed, and reconnected in a timely manner to avoid a lengthy shut down. Copper lines were cut and rewelded with roofing work being completed within 24 hours.
Highlight 02
Interior tarping installed throughout the interior of the building, all completed after hours to not disturb the operations of the building.
Highlight 03
A scan to identify all conduits that are running on the upper flute of the steel deck was completed to confirm areas of risk, considering this project was a mechanically fastened job (insulation mechanically fastened). This scan and the results were followed throughout the project and 0 incidents were recorded relating to mechanical fasteners hitting a conduit.